by arborcreative | Mar 19, 2019
Bellevue Erosion Repair Erosion Repair Bellevue, NE Church A church in Bellevue hired Sierex to repair severe erosion down a hill next to the parking lot. Scope of Work: Stabilize the eroding area Shape the ground Install barriers Encourage grass and ground cover...
by arborcreative | Dec 28, 2018
Veterans Park Veterans Park Papillion, NE SIEREX installed these gorgeous entrance signs at Veterans Park in Papillion, NE. Thanks to the City of Papillion and Joe Putjenter of Artistic Sign and Design for the opportunity to install your lovely designs! Scope of...
by arborcreative | Dec 31, 2017
Papio Creek Creek Bank Erosion Repair Papio Creek La Vista, Nebraska A large pipe used to siphon sewage under Papio Creek had become exposed because of erosion. SIEREX excavated and re-built the eroded creek bank and installed state-of-the-art armored erosion control...
by arborcreative | Dec 28, 2017
Waterline Relocation Local Power Plant Omaha, Nebraska The North Omaha OPPD power plant had exposed a secondary 12-inch water main when excavating a drainage ditch in the ash landfill. SIEREX was hired to excavate the area and relocate the pipe five feet lower under...
by arborcreative | Dec 28, 2017
Erosion Repair Erosion Repair Prairie Development Papillion, Nebraska SIEREX repaired significant erosion damage of a hill caused by storm water runoff. Additionally, SIEREX cleaned existing inlet protection, and seeded and matted all disturbed areas. Scope of Work:...
Recent Comments